Design of controlled modulus columns without load transfer platform

14th Australia & New Zealand Young Geotechnical Professionals Conference, Rotorua, 2022

Ground improvement by means of Controlled Modulus Columns (CMCs) usually involves the construction of a Load Transfer Platform (LTP) over the CMCs, especially for construction of low embankments over soft soil, to carry the overburden load and transfer to the CMCs, thereby not loading the surrounding soft soils, and avoiding excessive total and differential settlement. Show more…This paper provides a case study of a design undertaken for CMCs without an LTP, taking advantage of a relatively high embankment (4.5 m). Compacted fill and gravel working platform layers have been considered to be sufficient to dissipate any differential settlement at the surface of the embankment, without a need for an LTP. Available settlement monitoring data has confirmed the settlement to be within tolerable limits. Advantages of this method include time and cost savings, as well as environmental benefits.Show less…

Categories: Land + Buildings
Tags: 2022
Author: William T. Eom